L 6000
ECO 6000
L 7000
L 7000 Minibus
L 8000 Minibus
L 10000 Trade Car
L 15000
ASTAR
 
 
Technical Drawings
 
TECNICAL VALUES TRANSPORTATION - MOUNTING ACCEPTANCE BY FIRM DELIVERY CONDITIONS


1.0 TECHINAL VALUES
TECHNICAL PROPERTIES OF AUTO PAINTERS & DRIERS CABINE
It's a unit that has double fan which is used for aim to dry & paint of automobile and tools and like these.
Unit has main cabin, prepare air and control-command table.

Type : L 7000 Minibus (Double fan)

CABINE DIMENSIONS (Except heat unit)
Length  inside/ outside : 7000 / 7200 mm
Width    inside/ outside : 4000 / 4080 mm
Height   inside/ outside : 2070 / 3950 mm
 
PROPERTIES OF PANEL
Thickness of sheet-iron : 1mm Galvaniz outside surface is
special sheet-iron with paint
Tkickness of insulation : 50 mm. glass wool (cabine trunk,
and heat unit are in it)
 
AIR CIRCULATION
Absorbtion fan : 7.5 H.P. - 18 000 m3/ hour
Exhaust fan : 7.5 H.P. - 18 000 m3/ hour
Air speed in the cabine : 0.22 m/ second
 
AIR FILTERS
Kind of front filter : DIN 24185 EU 4 Suitable
Kind of ceiling filter : DIN 24185 EU 5 Suitable
Kind of floor filter : DIN 24185 EU 3 Suitable
Kind of Exhaust filter : DIN 24185 EU 3 Suitable
 
HEATING
Oil burner heating power : 200.000 kcal/h
Type of oil : Motorin
 
ELECTRIC
Total power : 15 Kw ( max. ), 380 Volt 50 Hz.
Lighting power : 40 quantity of Florescent lamb
with 40 Watt, total 1600 Watt
 
PLATFORM
Raised ( 300 mm )
 
TYPE OF MOUNTING
Can be reconstracted

1.1 MAIN

Side walls are manufactured from 1 mm tin plate which glass side is insulated with 50 mm thichness.The exterior surfaces of panels are dyed with exported static powder paint in order to provide an ergonomical apperance and longer life duration.

İt has a lighting system which is designed to raise the colour control to its best, throughout painting. Lighting is provided with 40 guantity Florescent lamb with 40 W.

In the cabin, there is a railed hanger system which is hanged to ceiling and provides to dye the parts near the automobile .

Ceiling is made of tin plate panels which are reinforced with private isolation, and it provides walking during the repairing studies.

A long lasting filter element which is made of unflameable substance and has private and high performance, is placed under the ceiling, in order to clean the air given into the cabin.
In front of the cabin there are 4 doors for the enterance of cars and one door for the enterance and exit of personnel. Door elements have observing windows made of security glasses.
Base is made of steel constraction which provides the all system to mount into an exist concrete ground. On steel constraction, a galvanized grate and a chequered tin plate ststem, which can carry 650 kg. wheel weight and increase the dust flowing, is placed.

In our standart models, there is a loading platform with 400 mm height.

 
1.2 AIR SEEDING UNIT
This unit gives the filtered and fresh air to the cabin and throw away the used air from the cabin throughout dying, and it heats the air upto 80 degrees and gives it through the cabin, and mixtures the used air with 10% fresh air (by otomatic multidanper ) throughout drying, finally, by reheating it cycles the air.

The heating of the air can be provided by motorin oil burner with the capacity of 200.000 kcal/ h, and by a heat exchanger which is manufactured from 304 guality stainlees steel tin plate. In the first operation, increasing the air heat upto 60 degrees takes approximately 15 minutes, due to the outside wheather conditions. Giving the heated or unheated into the cabin or cycling is provided by two industrial fans with each capacity of 18.000 m3 / h. After air is passed from a pre- filter in this unit, then it is transfered to cabin. Further more, exit air controled by a damper which is avaible in the exit air channel.
 
1.3 ELECTRIC SYSTEM

Electric and Command Table

It is a table which motor and devices captured by reconciliation are commaned and controled from a center in order to make their functions.
Table is manufactured from Galvaniz tin plate and steel profile, which is resistant to strokes, completely closed and never transfers dust and moisture.

Table include all motors, the neccessary breaker and fuse for the electrical devices,and in the neccessary conditions, signal lambs, termic roadcast, and clemens.
Moreover, heat indicator and termostat which adjusts the kiln heat and a time roadcast which kiln-dry time is adjusted, are added to the control table.

 
ELECTRIC INSTALLATION

Command and control assembles which come from electric table and go to motors and electrical devices, will be made from cables which are resistant to heat. Electric lines, foundation and their changes will be placed in an easy way.

Devices which are ready to operate : 380 v. 50 Hz. voltage of control devices is 220 volt. All electric installation will be founded according to the valid electric conditions in Turkey. Three fase electric which is needed for the devices requested, will be brought by our firm upto to the place where table will be put.


2.0 TRANSPORTATION - MOUNTING - ACCEPTANCE BY FIRM

Transportation

The devices will be delivered in our facility. If exportation is requested to be done by ARYA OTO SERVİS EKİPMANLARI SAN. VE TİC.LTD.ŞTİ. , the exportation and transportation costs will be paid by your firm.

 

2.1 Mounting and Acceptance by Firm

To place the devices in areas which are previously prepared for mounting according to the project, issued by us and the including to the firm, will be done under the autity of a technician.

The electricity of the devices till the electricity panel and the pressure air to the available connection, the supply of the motorin lines will be done by you and the connection of these lines will be done by our tecnician.
All construction issuances, including ( chimney crosings ) which are neccessary before the mounting and during the mounting, and motorin stock tanks and etc. will be done by your company.

 
2.2
For a first few mounting , a person would be send to the your country, in which the mounting will be done. The customer will supply 2 or 3 personnels for assistance. In this time you will found your service and assembly team.
 
2.3
All expenditures of our person, who will send to the country in which the mounting will be done, including , flight tickets , feeding and residance will be captured by your company. The mounting has to be finished within 7 days.
 
2.4
For a sending of a person for the mounting, ARYA OTO SERVİS EKİPMANLARI SAN. VE TİC.LTD.ŞTİ. has to be informed latest 15 days before the date of the mounting about the exact mounting date.
 
2.5
The mounting of the cabin has to be done within of 75 days after the date of delivery. If your company doesn't issues the neccessary preparation for the mounting within of 75 days, the obligation of the ARYA OTO SERVİS EKİPMANLARI SAN. VE TİC.LTD.ŞTİ. , will be cancelled.
 
2.6
The person who will send for the mounting will have no devices. All required devices will be supplied in the mounting country by your company.
 
2.7
All legal licences, for example working permits or visas will be got by your company.
 

3.0 DELIVERY CONDITIONS
Ex works

All deliveries and mounting are captured by our ''GENERAL SALES AND MOUNTING CONDITIONS ''.






Copyright 2003 © AUTO SERVICE EQUIPMENTS SANAYİ VE TİC LTD. ŞTİ.